[2] Gabriel Fernandez & Tirso A. Alvarez Jr. seepage-induced effective stresses and water pressures around pressure tunnels [J]. Journal of Geotechnical and Geoenvironmental Engineering.,1994,9
[3] In-Mo Lee , Seok-Woo Nam. Effect of tunnel advance rate on seepage forces acting on the underwater tunnel face [J]. Tunnelling and Underground Space Technology 19 (2004) 273–281 [4] 曾亿山,卢德唐,曾清红,董虎. 单裂隙流固耦合渗流的试验研究[J].实验力学,2005,3 [5] 刘 阳,周文革. 天古崖水库与隧道的水文地质关系之分析[J].甘肃科技,2005,5 [6] 杨永恒,仵彦卿,丁卫华. 李家河水库与李家河隧道的水力联系研究分析[J].西北水力发电,2005,5
[7] 赵东平,王明年. 水库蓄水后对既有傍山铁路隧道,运营安全的影响研究[J].现代隧道技术,2005,12
[8]侯伟,仵彦卿,何立志.基于GEO-SLOPE分析高水头作用下水库对隧道的渗流影响[J].西安理工大学学报,2006,10
[9] 施成华. 隧道开挖及疏水引起的地表沉降与变形[J].中国公路学报,2007,1
[10] 李地元,李夕兵 ,张伟 ,宫凤强 ,黄炳仁. 基于流固耦合理论的连拱隧道围岩稳定性分析[J].岩石力学与工程学报,2007,5
[11] N. Coli , G. Pranzini,A. Alfi,V. Boerio. Evaluation of rock-mass permeability tensor and prediction of tunnel inflows by, means of geostructural surveys and finite element seepage analysis [J]. Engineering Geology 101 (2008) 174–184
[12] 李建波 ,陈健云 ,李 静. 渗流场对地铁隧道沉降与受力影响的流固耦合分析[J]. 防灾减灾工程学报,,2008,11
[13] 周益军,高燕希,杨 进. 隧道开挖时地下渗流场的模拟分析[J].公路与汽车,2008,7 [14] 赵二项,高江涛. 考虑渗流场作用下的隧道开挖分析[J].岩土工程技术,2009,10 [15] Feng-Rong Yang,Cheng-Haw Lee ,Wen-Jui Kung, Hsin-Fu Yeh . The impact of tunneling construction on the hydrogeological environment of“Tseng-Wen Reservoir Transbasin Diversion Project” in Taiwan [J]. Engineering Geology 103 (2009) 39–58
[16] 靳晓光 ,李晓红 ,张燕琼. 越江隧道施工过程的渗流一应力耦合分析[J].水文地质与工程地质,2010,1
[17] Mao Ronghua , Liu Shushu,Ma Fef,Li Zan,Zhang Xiaoehun. The Numerical Simulation Analysis of Ground Settlement of Around Tunnel under Ground-water Seepage [C]. 2010 2nd Conference on Environmental Science and Information Application Technology [18] 段青龙. 库车县铜厂水库对库俄铁路隧道的影响评价[J].西部探矿工程,2010,4 [19] J. Moon , G. Fernandez. Effect of Excavation-Induced Groundwater Level Drawdown on Tunnel Inflow in a Jointed Rock Mass [J]. Engineering Geology 110 (2010) 33–42
[20] 吴金刚,谭忠盛,皇甫明. 高水压隧道渗流场分布的复变函数解析解[J].铁道工程学报,2010,9
[21] Jong-Ho Shin , In-Mo Lee,Young-Jin Shin. Elasto-plastic seepage-induced stresses due to tunneling [J]. Int. J. Numer. Anal. Meth. Geomech. 2011; 35:1432–1450
[22] Alessandro Graziani ,Daniela Boldini. INFLUENCE OF HYDRO-MECHANICAL COUPLING ONTUNNEL RESPONSE IN CLAYS [J]. Journal of Geotechnical and Geoenvironmental Engineering.,2011,9
[23] 郭牡丹, 王述红, 荣晓洋, 杨 昊. 基于流固耦合理论的隧道涌水量预测[J].东北大学学报,2011,11
2.2 下穿水库隧道施工技术研究现状
[24] 柯小华,朱光仪. 水库底隧道防水的施工技术[J].公路交通技术,2002,7 [25]邹代峰,贾德华.赤岭隧道水库库底的施工技术[J].铁道建筑,2002,12 [26]郭晓红,梁巍. 穿越水库底部的全封闭隧道结构设计[J].公路交通技术,2002, [27] 林荣新. 通过水库底的浅埋隧道施工之一例[J].铁道建筑技术,2005,5 [28] 刘贵平. 下穿城市干道沟涵的地铁隧道支护结构设计浅析[J]隧道建设,2007,8 [29] 宋延波. 水库底隧道防水的施工技术[J].铁道建筑,2008,7
[30] 张红卫,田志新,张爱民. 石板山隧道穿越水库浅埋段帷幕注浆堵水施工[J].山西交通科技,2008,7
[31] 祝志义. 隧道穿越水库浅埋段帷幕注浆施工技术[J]山西建筑,2008,10
[32] 王北京. 甬台温铁路燕居岭隧道浅埋下穿水库安全施工综合技术[J].中国建设信息,2009,8
[33] 常立军. 铁路客运专线隧道过水库浅埋地段施工技术[J]山西建筑,2010,4
[34] 赵栋山. 沙驮山隧道下穿水库设计与施工方案[J].山西交通科技,2010,8 [35] 刘成. 浅谈段家屋隧道通过水库段施工方案[J].交通建设与管理,2011,6 [36] 王志明,张海英. 某高危隧道穿越洞顶水库施工技术[J].施工技术,2011,6
因篇幅问题不能全部显示,请点此查看更多更全内容
Copyright © 2019- zicool.com 版权所有 湘ICP备2023022495号-2
违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com
本站由北京市万商天勤律师事务所王兴未律师提供法律服务